Assuming the case that a power outage occurred due to an earthquake or the like, and the elevator of the high-rise apartment stopped moving before the disaster prevention day, electric power was supplied from the electric car A demonstration experiment to move the elevator was held on 29th, Chuo-ku, Tokyo.